KO-MATS SUPPLIES DRAGLINE BULKHEADS FOR EUGAL PIPELINE

Request quote

Ko-mats supplies dragline bulkheads for load distribution and stability of side arms during pipeline construction

Nearly 500 km of pipeline from the Baltic Sea to the Czech Republic

The EUGAL pipeline is to supply south-eastern Europe with natural gas from the end of 2019. It runs from the Baltic Sea via Mecklenburg-Western Pomerania and Saxony to the Czech Republic and is about 480 km long.

Ko-mats supplied 200 Bongossi dredging mats type 520 (200×950/1000x5000mm) to Arge EUGAL lot 3 + 4. The dredge mats helped with load distribution and provided the necessary stability for the side arms that passed under the Uecker and ICE DB line in the Microtunnel. Arge EUGAL Lot 3 + 4 is a consortium consisting of Johann Bunte Bauunternehmung, Per Aarsleff and A.Hak.

We have already supplied several thousand dragline bulkheads to the various consortium partners involved in the project this year.

Are you currently planning a project?
We would be happy to advise you.

Contact us

RELATED PROJECTS

Blankenburgverbinding draglineschotten ko-Mats
German solidity in dragline bulkheads during construction of Blankenburg connection
View project
Draglineschotten
Ko-Mats delivers Crane mats for the new 1000 Tons Crawler crane for the HÜFFERMANN Group
View project
West of Duddon Sands wind farm Ko-Mats project
West of Duddon Sands wind farm
View project
Contact us